What a 90-Day Operations Sprint Can and Cannot Fix

Daniel Simoes, Future Operations

Daniel Simoes, Senior Partner & Managing Director

Workers on a warehouse floor among stacked boxes

Six months into an eighteen-month program, the chief operating officer of an energy company told me the program was dead. The steering committee still met every two weeks. The PMO still produced status decks with green and amber indicators. The people who had to change how work got done had stopped believing anything would change.

A 90-day sprint fixes one thing. It takes a single operational process from documented intent to live, measured change, with the people who run that process doing the work. It does not fix culture. It does not migrate a core system. It does not move a regulatory deadline. A small firm that claims it can squeeze an eighteen-month program into a quarter is selling you the same theater at a faster tempo.

Why do so many transformation programs stall?

Most programs stall because they cannot show a result before the organization loses patience. McKinsey’s most recent primary data on this, a Global Survey of 1,034 respondents run between 18 May and 29 June 2021, found that less than one-third said their transformation both improved performance and sustained the improvement.

You have probably heard a different number. “Seventy percent of transformations fail” appears in consulting decks, conference keynotes and, until a fact-check caught it, an earlier draft of this article. The figure comes from Michael Hammer and James Champy’s 1993 book Reengineering the Corporation, where they remarked in passing that 50 to 70 percent of reengineering efforts did not achieve their intended results. They offered no data. Two years later, in The Reengineering Revolution, written with Steven Stanton, Hammer withdrew the claim and wrote that “there is no inherent success or failure rate for reengineering.” Mark Hughes reviewed the published instances of the 70 percent figure in the Journal of Change Management in 2011 and found no valid and reliable empirical evidence behind any of them.

The defensible number is fewer than one in three sustaining their gains, on McKinsey’s own survey. Jon Garcia of McKinsey’s transformation practice, in a 2022 interview, named the recurring causes as weak execution discipline, slow decisions about people, and the failure to hold gains once the formal program ends. Each of those three gets worse as a program gets longer.

What does a long timeline do to the people inside it?

A long timeline tells a team it has time, and the team plans accordingly. Decisions that should take a week take six. Pilots wait for the right conditions. No single quarter feels urgent, so nothing forces a result.

Daniel Kahneman and Amos Tversky named the planning fallacy in 1979: people underestimate how long their own tasks will take. Roger Buehler, Dale Griffin and Michael Ross ran the core experiments in 1994, on students estimating their own assignments. That evidence covers individuals estimating short tasks, so I will not stretch it on its own to cover an eighteen-month program. Bent Flyvbjerg’s work on megaprojects makes the organizational case. Across his dataset, nine out of ten large projects overrun their cost estimates, and his remedy, reference class forecasting, plans from what comparable projects actually took. Lavagnon Ika argued in 2025 that the planning fallacy is too narrow to explain large project overruns by itself. I agree. Optimism about time is one cause. A long plan that lets everyone defer is another.

Meanwhile the organization keeps moving. Kayla Velnoskey, Ingrid Laman and Carolina Valencia of Gartner’s HR practice, writing in Harvard Business Review on 15 January 2026, describe change that is continuous, stacked and interdependent. Gartner’s own term for this is “ungovernable change.” A Gartner press release from 8 July 2025 reported that only 32 percent of business leaders had achieved healthy change adoption. Hannah Wilson of Grant Thornton, writing from practice rather than from survey data in 2024, lists the drivers of change fatigue as too many parallel initiatives, unclear objectives and insufficient support. A broad, long program produces all three.

What does a 90-day sprint actually fix?

A sprint closes the gap between documentation and change. It forces a team to choose one process, build a working version with the tools they already have, and put it in front of real users before the quarter ends. The output is evidence, and evidence buys the next quarter.

The cadence is fixed. Days 1 to 30 are for scope: one process, one sponsor, one definition of done expressed in numbers. A sprint that addresses five problems solves none. Days 31 to 65 are for building and testing on existing systems and data, with no requirements document for something to be built later. Days 66 to 90 put the process live with a pilot group, measure it, and define the roles and governance that carry it into the next cycle.

A financial services firm I worked with had spent nine months on a digital operations initiative. It had a detailed implementation plan and had not changed a single process. We restructured the remaining work into one 90-day sprint on the process that touched the most customers. The team cut everything that was important but not first. A working prototype existed in four weeks. By day 75 the new process was live with a pilot group, and it cut processing time for that workflow by 34 percent. The evidence sat in the system where everyone could see it.

A visible finish line also changes how people show up. Hengchen Dai, Katherine Milkman and Jason Riis, in Management Science in 2014, showed that people pursue goals more at temporal landmarks. Google searches for “diet” rose 14.4 percent at the start of a week and 82.1 percent at the start of a year. University gym visits rose 33.4 percent on Mondays and 47.1 percent at the start of a semester. Those are findings about individuals and their own habits. Nobody has measured the effect on a corporate program, so I use it as an analogy. My observation from the floor is that a hard 90-day boundary moves behavior in the same direction. Treat that as an observation.

What does a 90-day sprint not fix?

Three kinds of work resist a 90-day boundary, and I will not take them on as sprints. Deep culture change, complex core technology migrations and regulatory transformations each run on a clock the sprint cannot set.

Culture first. Shifting ingrained behavior across thousands of people takes years of consistent signals from leaders, and a sprint that declares victory on a survey bump is theater at speed. Technology second. A core system migration is sequenced by technical dependencies and cutover windows, and the sequence does not care about your quarter. This is the territory where Flyvbjerg’s nine-in-ten overrun figure lives, and the honest response is reference class forecasting and a longer arc. Regulation third. When a regulator sets the date and the scope, the pace is external, and squeezing it creates compliance risk with no offsetting benefit.

A sprint also does not fix a program with no destination. Ninety days on the wrong process is ninety days wasted with better morale.

How do sprints fit inside a longer program?

The multi-year vision stays. It becomes the governance layer that sequences sprints, holds strategic coherence and decides what the next quarter builds on. A chain of sprints run over two years is still a two-year program. The difference is that each quarter produces something you can inspect.

Harvard Business School’s 2021 case on Komerční Banka, by Euvin Naidoo, Suraj Srinivasan and Sarah Gulick, documents a multi-year agile transformation begun in 2017 under chief executive Jan Juchelka. The bank built an Agile Center of Expertise, organized work into Agile Tribes and ran on OKRs. That program was an enterprise commitment over several years, and I will not dress it up as a sprint. What the case shows is a governance layer breaking a long commitment into short cycles with frequent review and reprioritization.

The strongest challenge to my argument comes from Darrell Rigby and Zach First in “Get Off the Transformation Treadmill,” Harvard Business Review, January-February 2026. They argue that organizations trapped in serial, overlapping transformations should stop launching them and instead improve their business systems continuously and incrementally. They are right about the treadmill, and a badly run sprint program becomes one: a new hero project every quarter with no memory between them. Their remedy and mine meet at the governance layer. A sprint that improves one process and hands the result to a standing system of review is continuous improvement with a deadline. A sprint launched as a fresh transformation every quarter is the treadmill they warn about.

What should you do with your next program?

Look at your program timeline and ask whether the duration was a design decision or the number that felt reasonable when the plan was written. If it was the latter, pick one workstream, define a 90-day deliverable in numbers, staff it with people who have the authority to decide, and show the result before the quarter ends.

Your organization will not transform in 90 days. Fewer than one in three programs sustain their gains, and the ones that do can show, at intervals short enough to hold attention, what has changed. The sprint is how you prove the program is working while the organization still has the patience to care. Where the work will not fit into a sprint, say so before the contract is signed. Saying so has cost me proposals and, so far, no clients.


Sources

  1. McKinsey & Company, “Losing from Day One: Why Even Successful Transformations Fall Short,” McKinsey Global Survey, 7 December 2021. 1,034 respondents surveyed 18 May to 29 June 2021.

  2. McKinsey & Company, “Common Pitfalls in Transformations: A Conversation with Jon Garcia,” interview, 29 March 2022.

  3. Michael Hammer and James Champy, Reengineering the Corporation: A Manifesto for Business Revolution, HarperBusiness, 1993.

  4. Michael Hammer and Steven A. Stanton, The Reengineering Revolution: A Handbook, HarperBusiness, 1995. Source of the withdrawal of the 1993 figure.

  5. Mark Hughes, “Do 70 Per Cent of All Organizational Change Initiatives Really Fail?”, Journal of Change Management, vol. 11, no. 4, 2011, pp. 451-464.

  6. Daniel Kahneman and Amos Tversky, “Intuitive Prediction: Biases and Corrective Procedures,” TIMS Studies in Management Science, vol. 12, 1979, pp. 313-327.

  7. Roger Buehler, Dale Griffin and Michael Ross, “Exploring the ‘Planning Fallacy’: Why People Underestimate Their Task Completion Times,” Journal of Personality and Social Psychology, vol. 67, no. 3, 1994, pp. 366-381.

  8. Bent Flyvbjerg, “What You Should Know About Megaprojects and Why: An Iron Law of Megaproject Management,” Project Management Journal, vol. 45, no. 2, 2014, pp. 6-19.

  9. Lavagnon A. Ika, “The Rise and Fall of the Planning Fallacy,” in The Cambridge Handbook of Project Behavior, Cambridge University Press, 2025.

  10. Kayla Velnoskey, Ingrid Laman and Carolina Valencia, “Why Keeping Up with Change Feels Harder Than Ever,” Harvard Business Review, 15 January 2026.

  11. Gartner, press release, 8 July 2025: 32 percent of business leaders report achieving healthy change adoption.

  12. Hannah Wilson, “Change Fatigue: When Transformations Start to Drag,” Grant Thornton, 14 March 2024. Practitioner opinion; no survey data.

  13. Hengchen Dai, Katherine L. Milkman and Jason Riis, “The Fresh Start Effect: Temporal Landmarks Motivate Aspirational Behavior,” Management Science, vol. 60, no. 10, 2014, pp. 2563-2582.

  14. Euvin Naidoo, Suraj Srinivasan and Sarah Gulick, “Enterprise Agility at Komerční Banka,” Harvard Business School Case 121-020, February 2021.

  15. Darrell Rigby and Zach First, “Get Off the Transformation Treadmill,” Harvard Business Review, January-February 2026, reprint R2601B.